Please use this identifier to cite or link to this item:
https://repository.iimb.ac.in/handle/2074/17199
Title: | Project management system: An analysis of cost and time overruns; Thermax Limited | Authors: | Ravi Shankar, S | Keywords: | Project management system;Cost and overruns | Issue Date: | 1994 | Publisher: | Indian Institute of Management Bangalore | Series/Report no.: | PGP_SP_N4_155 | Abstract: | This report is an analysis of the Project Management System of one of the divisions of Thermax limited addressing the problems of cost and time overruns in particular. Four turnkey Projects were analysed in detail and common areas of concern were enlisted. As an ongoing effort, few organisations involving in similar operations were studied for their Project Management and this study was utilised in making some useful suggestions to improve the Project Management of this division per se. The main recommendation is that the organisation should concentrate more on controlling time overruns and on completion. of the project undertaken within the committed time. It was also suggested to incorporate an organisation structure that is most suited to execution of turnkey projects-A Temporary Matrix structure. | URI: | https://repository.iimb.ac.in/handle/2074/17199 |
Appears in Collections: | 1990-1995 |
Files in This Item:
File | Size | Format | |
---|---|---|---|
PGP_SP_N4_155.pdf | 440.17 kB | Adobe PDF | View/Open Request a copy |
Google ScholarTM
Check
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.