Browsing by Type Project Report-MPT


Or, select a letter below to start browsing
0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Showing results 141 to 160 of 166 < previous   next >
Issue DateTitleSub-TitleAuthor(s)Journal NameVolume NumberIssue NumberPages
1997Single piece flow-Siemens Ltd.: Calcutta-Gokhale, C P ; Mitra, Gautam 
1999Skill development: a gap analysis-Banerjee, Debashish 95p.
1994Soldering defects reduction: A design of experiments approach-BPL Ltd: Bangalore.-Choudhary, Sanjay Roy 
1993Strategic diversification in the contextnrecessionary conditions-Indian Charge Chrome Ltd.-Sahu, K C 
1996Strategic market planning for hollow insulator division-Harisubramanian, P. K. 71p.
1993Strategies for solvent extraction oil industry-G.B Engineering Enterprises (P) Limited,-Ravikumar, N 
1996Strategies to improve after sales service and spares support-Dhakshayani Kumar, K. ; Vidyadhar Shetty, K. 159p.
1993Study fo purchasing system and procedures-Indian Institution of Management Banaglore: Banglaore.-Sudaresan, N. 
1998Study of energy consumption pattern in the kudremukh plant of KIOCL and optimisation of same-Satheesh Kumar, R. ; Sahi, Sanjeev 229p.
1994study of kandla-Bhatinda Pipeline project team cultureand construction monitoring-Indian Oil corporation: Rajkot.-Yadav, S K 
1996Study of present practices in spare parts management at Mangalore-KIOCL: Mangalore.-Jayashankar, M 
1998Study of production and cost information systems: At helicopter division Hindustan aeronautics Ltd: Bangalore. Indian Institute of Management Banglore.-Sharma, G Shrikantha 
1997Study of production incentive scheme at ABB, Nashik to increase productivity-Jyotidev, Pallab 59p.
1994Study of various alternative to suggest methods for improving the efficeency of the design and engineering department-H A L: Locknow Division.-Ravi, Prakash 
1994Study on organisational culture and it's impact on manager's in KIOCL: Kudremuck.-Jagadeesh, N N 
1998Supplier management strategies for enhancing manufacturing competence-Surianarayanan, P. B. ; Sivakumar, K. 82p.
1993Throughput accounting- Indian Institution of Management Banglaore: Bangalore.-Phatak, Amol 
1996To introduce a system for using quality performance measures as an effective tool for continous improvement activitices-Kirlosker Electric Company Ltd.:Hubli.-Balraj, S 
1993Tool management-Madusudan 23p.
1993Total project management-Walchandnagar Industries Ltd,-Swamy, M L N