Browsing by Type Project Report-MPT


Or, select a letter below to start browsing
0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Showing results 56 to 75 of 166 < previous   next >
Issue DateTitleSub-TitleAuthor(s)Journal NameVolume NumberIssue NumberPages
1998Faster new product development through improved engineering, R & D perfarmance-Indian Institute of Management: Banglore.-Jagannathan, A 
1993Feasibility report for tool room expansion-Electronic controle gear (India) Limited-Hema, Metha R 
1997Feasibility study of broiler feed pelleting-Kanakanand, S. 72p.
1997Feasibility study of running two pacol reactors together in series or parallel-Chaudhari, J. K. 41p.
1998Formulating a customer feedback system for tractors-Mantri, Virendra. S. 39p.
1993Formulation diversification strategy for a tele-communication industry - Indian telephone industies, Mankapur-Mrigendra Kumar 
1993Formulation of Marketing/sales strategy for achieving the desired sales for Bombay, Pune and Maharashtra branches-Indian Institution of Management Bangalore: Bangalore.-Sappadla, V B 
1994Framework for capacity analysis and design a cellular manufacturing system-ABB Nasik.-Ladhe, Rajendra 
1996A framework for creating competitive advantage through throughput time reduction:The case of hindustan 1035N dumber-Hindustan Motor Limited.-Ravichandran, N. 
1999Gaps in pricing tools-Anand, B. 73p.
1999Impact of technological changes on manpower-Kumar, Shrish 49p.
1997Implementation of TPM in the fine boring cell at wheel cylinder unit, brakes India, Madras-Parasuraman, T. R. 102p.
1999Implementing statistical process control in Yarn Manufacturing (Spinning)-Bhosale, Yuvaraj 61p.
1993Improve performance of maintenance system at matralayam plant of ITC agro tech-Indian Institution of Management Baqngalore: Bangalore.-Sukumar, S N 
1994Improve return on investment with better working capital management-ABB Ltd: Baroda.-Mallikarjuna, C S N 
1993Improved vender rating system-Mahindra and Mahindra Limited, Bombay-Kackar, Tarun 
1998Improving delevary reliability: Avasarala Automobile Ltd.: Indian Institute of Management Banglore.: Banglore.-Basavaradder, Ashok 
1998Improving delivery reliability-Basavaradder, Ashok 84p.
1998Improving human resoures system at Kudremuk Iron Ore Company Ltd: -Indian Institute of Management: Banglore. Banglore-Raghuramulu, S ; Kutty, Thomas V C 
1996Improving manufacturing effectiveness through implementation of stall-built system in chiller shop at Thermax Ltd: Pune.-Wale, Shrikant K.