Please use this identifier to cite or link to this item: https://repository.iimb.ac.in/handle/123456789/9212
Title: Third party logistics: a framework for Indian railways
Authors: Prem Narayan 
Keywords: Indian Railways;Logistic management
Issue Date: 2007
Publisher: Indian Institute of Management Bangalore
Series/Report no.: CPP_PGPPM_P7_20
Abstract: The introduction of demand-pull based EOQ procurement system along with Third Party Logistics (3PL) service provider and implementation of Routing and sequencing of vehicles based on Saving Matrix Method, being looked as a tool for increasing efficiency and reducing the cost. In the context of Indian Railways, Materials Management is one of the areas where expenditure on materials is of the order of Rs 13000 crores and there is a possibility of cost cutting by employing efficient method of procurement and introduction of 3PL service provider, as there is no much scope to reduce wages bills and pension liability drastically. A frame work based on EOQ model of procurement have been developed on optimization of total cost of ownership (TCO) which contains four elements of cost viz. annual ordering cost, annual materials cost, annual inventory holding cost and annual transportation cost. The choice of location of collection centres (CC) is based on well thought out critical factors. The CCs in the Railway premises would be operated by the 3PL service provider, whose prime role would be the effective coordination with vendors, MTN Stores Depot and the Purchase office for most efficient ways of materials transportation by effective segregation, consolidation and dispatch in Full Truck Loads (FTL) to MTN Stores Depot. For the check on optimality of the mathematical modeling of TCO, A and B category stock items pertaining to MTN stores depot, having annual usage value of Rs 84.04 crores have been considered. The results of analysis have shown cost saving of the order of Rs.6.78 crores over current TCO of Rs. 95.62 crores while considering introducing 3PL service provider in the Materials Management function. The cost saving can further be achieved by implementing Routing and Sequencing of vehicles based on Saving Matrix Method. The proposed model apart from cost saving will result in to avoidance of stock out situations on one hand and better control of inventory on the other hand.
URI: http://repository.iimb.ac.in/handle/123456789/9212
Appears in Collections:2007

Files in This Item:
File SizeFormat 
DIS_PGPPM_P7_20 _PP4586.pdf744.06 kBAdobe PDFView/Open    Request a copy
Show full item record

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.