Please use this identifier to cite or link to this item:
https://repository.iimb.ac.in/handle/2074/11813
DC Field | Value | Language |
---|---|---|
dc.contributor.author | Hazra, Jishnu | |
dc.date.accessioned | 2020-04-23T14:26:35Z | - |
dc.date.available | 2020-04-23T14:26:35Z | - |
dc.date.issued | 2003 | |
dc.identifier.issn | 1368-2148 | |
dc.identifier.uri | https://repository.iimb.ac.in/handle/2074/11813 | - |
dc.description.abstract | We analyse an assembly system fed by components produced by suppliers and operating under a pull system with random processing times. Under certain assumptions we present a performance evaluation algorithm which is based on physical decomposition of the network and use of an aggregation/disaggregation algorithm. We consider two important performance measures: system throughput and work-in-process inventory. Performance evaluation of these systems is difficult because of the mating of parts and a kanban-like operating mechanism. Our algorithm was tested using simulation and found to be accurate. | |
dc.publisher | Inderscience Enterprises Ltd. | |
dc.subject | Inventory estimation | |
dc.subject | Pull-based supply system | |
dc.subject | System throughput inventory | |
dc.subject | work-in-process inventory | |
dc.title | Throughput and inventory estimation of a pull-based supply system | |
dc.type | Journal Article | |
dc.identifier.doi | 10.1504/IJMTM.2003.003705 | |
dc.pages | 492-506p. | |
dc.vol.no | Vol.5 | - |
dc.issue.no | Iss.5 | - |
dc.journal.name | International journal of manufacturing technology and management | |
Appears in Collections: | 2000-2009 |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.