Browsing by Type Project Report-MPT


Or, select a letter below to start browsing
0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Showing results 122 to 141 of 166 < previous   next >
Issue DateTitleSub-TitleAuthor(s)Journal NameVolume NumberIssue NumberPages
1998Process reengineering and total productive maintenance-Krishnan, S. 64p.
1998Product costing in a textile spinning mill-Khalatkar, Avinash M. 71p.
1997Product costing of distribution relays using ABC concept-Ganoo, Prashant P. 99p.
1996Product costing using activity based cost system: Pilot study of the splicaste pump division-Kirlosker brothers Limited: Kirloskaravadi.-Khedekar, Gautam J 
1993Project Cost Analysis-Mahindra and Mahindra Ltd: Nasik Division.-Digge, S S 
1993Project monitoring and site management for HV substations-Indian Institution of Management Bangalor: Bangalore.-Gupta, Omkar 
1993Project plan for new product development-Bansode, Nitin 36p.
1996Project report on product costing using activity based cost system: pilot study of the splitcase pump division in Kirloskar brothers limited, Kirloskarvadi-Khedekar, Gautam J. 97p.
1998QS 9000: a network on new product development-Desikan, Srinivasa V. 78p.
1993Quality information system-Bharat Electronics, Bangalore.-Anil Kumar, K T 
1993Quality planning for new development ( Bought-out components)-Mahindra and mahindra Ltd: Bombay.-Limaye, Madhav R 
1994Re-engineering of the computerisation of process sheet for the detail components-Aircraft Division, H A L: Bangalore.-Shivaprasada, V 
1994Re-engineering the new product development process-Siemens Ltd: Bombay.-Rajkumar, N S 
1993Reducing product development cycle time- Indian Telephone Industries Limited, Bnagalore.-Suresh, R 
1997Reduction of veriety-ABB: Calcutta.-Bhattacharya, Sanjib 
1993Reorganisation of manufacturing of coil type boilers using cellular manufacturing-Thermax Ltd.-Kale, Pradip V 
1993Reorientation fo manufaturing introduction of group techonology in motor factory-Indian Institution of Management Bangalore: Bangalore.-Gadre, Sanjay 
1994Restructuring of logistics for reliance industries limited: Hazira manufacturing division-Reliance Industries Ltd: Hazira.-Singh, Diwaker 
1998Robust process design for enhancing manufacturing performance-Srinivas, G. 152p.
1997Single piece flow-Siemens Ltd.: Calcutta-Gokhale, C P ; Mitra, Gautam